Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.



 Decisions

Select Year:

Decision, ERC Case No. 2016-132 SC, In the Matter of Violation of ERC Orders, Rules and Regulations (Re: Failure to File the Certificate of Compliance [COC] Application Three (3) Months Before its Targeted Date of Test and Commissioning [PACERM-1 filed its COC application for its 3x3.5 MW Bunker - C Fired Power Plant located in Zone-1, Brgy. Quibonbon, El Salvador City, Misamis Oriental on 14 September 2016 which is later than 3 month period required]), PACERM-1 Energy Corporation (PACERM-1) respondent
Date Docketed:7/6/2018
Published: 7/6/2018


Decision, ERC Case No. 2017-009 MC, In the Matter of the Application for Approval of Applicant's (1) Business Separation and Unbundling Plan (BSUP); and (2) Accounting and Cost Allocation Manual (ACAM) in Accordance with the Provisions of Section 36 of R.A. 9136 and Rule 10 of its Implementing Rules and Regulations, Kepco SPC Power Corporation (KSPC) applicant
Date Docketed:7/6/2018
Published: 7/6/2018


Decision, ERC Case No. 2017-007 MC, In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECO's 69 kV System, Catuiran Hydropower Corporation (CHC) applicant
Date Docketed:6/28/2018
Published: 6/28/2018


Decision, ERC Case No. 2015 – 093 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (For: Violation of 2.2.7.1 of the Guidelines on the Collection of the FIT-All and Disbursement of the FIT-All Fund), Samar I Electric Cooperative, Inc. (SAMELCO I) respondent
Date Docketed:6/27/2018
Published: 6/27/2018


Decision, ERC Case No. 2016 – 035 MC, In the Matter of the Application for Approval of Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations, Ticao Island Electric Cooperative, Inc. (TISELCO) applicant
Date Docketed:6/27/2018
Published: 6/27/2018


Decision, ERC Case No. 2015 – 086 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (For: Violation of 2.2.7.1 of the Guidelines on the Collection of the FIT-All and Disbursement of the FIT-All Fund), First Laguna Electric Cooperative, Inc. (FLECO) respondent
Date Docketed:6/27/2018
Published: 6/27/2018


Decision, ERC Case No. 2016 – 043 MC, In the Matter of the Application for Issuance of a Certificate of Public Convenience and Necessity (CPCN), Tarlac Electric Inc. (TEI) applicant
Date Docketed:6/26/2018
Published: 6/26/2018


Decision, ERC Case No. 2015-001 RC, In the Matter of the Application for Approval of the Power Supply Contract (PSC) Between Olongapo Electricity Distribution Company, Inc. (OEDC) and San Miguel Corporation (SMEC), Olongapo Electricity Distribution Company, Inc. (OEDC) and San Miguel Corporation (SMEC) applicants
Date Docketed:6/22/2018
Published: 6/22/2018


Decision, ERC Case No. 2016 – 034 RC, In the Matter of the Application for the Approval of the Power Supply Contract (PSC) Entered Into by and Between Tarlac I Electric Cooperative, Inc. (TARELCO I) and San Miguel Energy Corporation (SMEC), with Motion for Provisional Authority, Tarlac I Electric Cooperative, Inc. (TARELCO I) and San Miguel Energy Corporation (SMEC) applicants
Date Docketed:6/22/2018
Published: 6/22/2018


Decision, ERC Case No. 2016 – 105 RC, In the Matter of the Joint Application for Approval of the Power Supply Contract (PSC) Enter Into By and Between Ilocos Sur Electric Cooperative, Inc. (ISECO) and San Miguel Energy Corporation (SMEC), with Prayer for Confidential Treatment of Information, Ilocos Sur Electric Cooperative, Inc. (ISECO) and San Miguel Energy Corporation (SMEC) applicants
Date Docketed:6/22/2018
Published: 6/22/2018

12345678910...>>

Issuances

A compilation of ERC guidelines, rules, regulations, procedures, decisions, orders and resolutions. For other issuances not included in this section, please contact the Office of General Counsel and Secretariat at tel. no. (02) 631-5806, E-mail: ogcs@erc.gov.ph

Today at ERC
Thursday, July 19, 2018

Hearing Schedules
Time:
10:00
Case No.:
2016-150 RC [EX]
Applicant:
PSALM
Venue:
ERC Visayas Field Office (VFO), St. Mary's Drive, Banilad, Cebu City
Title:
Petition for True-Up Adjustment of the National Power Corporations Stranded Debts Portion of the Universal Charge for the Luzon, Visayas and Mindanao Grids for Calendar Year 2015, with Prayer for the Issuance of Provisional Authority (PA)
Time:
14:00
Case No.:
2016-149 RC [EX]
Applicant:
PSALM
Venue:
ERC Visayas Field Office (VFO), St. Mary's Drive, Banilad, Cebu City
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended

© 2018 - Energy Regulatory Commission