Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.



Promulgated Rules, Decisions and Orders


Initial Order, ERC Case No. 2018-011 MC, In the Matter of Application for Authority to Develop, Own and/or Operate Dedicated Point-to-Point Limited Transmission Facilities to Connect the 500MW (Gross) Coal-Fired Power Plant to the Tayabas Substation of the National Grid Corporation of the Philippines (NGCP) through the Mauban Substation, San Buenaventura Power Ltd. Co. (SBPL) applicant
Date Docketed:9/6/2018
Published: 9/6/2018


Initial Order, ERC Case No. 2018-085 RC, In the Matter of the Application for Approval of the Feed - In Tariff Allowance for Calendar Year 2019 Pursuant to the Guidelines for the Collection of the Feed In Tariff Allowance and Disbursement of the Feed In Tariff Allowance Fund, with Prayer for Provisional Authority, National Transmission Corporation (TRANSCO) applicant
Date Docketed:8/10/2018
Published: 8/10/2018



Initial Order, ERC Case No. 2018-004 DR, In the Matter of the Petition for Classification of the Switchyard and Associated Equipment at The Pagbilao Power Station as Transmission Facilities, Energy World Power Operations Philippines, Inc. (EWPOPI) petitioner versus Team Energy Corporation (TEC), Pagbilao Energy Corporation (PEC), National Transmission Corporation (TRANSCO) and National Grid Corporation of the Philippines (NGCP) respondents
Date Docketed:8/8/2018
Published: 8/8/2018


Initial Order, ERC Case No. 2018-073 RC, In the Matter of the Application for the Approval for the Approval of Force Majeure Event Regulated FM Pass-Through for Earthquake in Leyte in the Visayas Region, In Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for Provisional Authority, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:8/3/2018
Published: 8/3/2018


Initial Order, ERC Case No. 2018-004 MC, In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 16 MW PHESI Wind Farm to NPC's 69 kV Transmission Line, Philippine Hybrid Energy Systems, Inc. (PHESI) applicant
Date Docketed:7/27/2018
Published: 7/27/2018


Initial Order, ERC Case No. 2018-007 MC, In the Matter o the Application for Authority to Develop, Own and/or Operate Dedicated Point to Point Limited Distribution Facilties to Connect the 81 MW Wind Power Plant to the 115 KV Malaya - Teresa Line, with Prayer for Provisional Authority, Alternergy Sembrano Wind Corporation (ASWC) applicant
Date Docketed:7/27/2018
Published: 7/27/2018


Initial Order, ERC Case No. 2018-043 RC, In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and Palm Concepcion Power Corporation, with Prayer for the Issuance of Provisional Authority, National Grid Corporation of the Philippines (NGCP) and Palm Concepcion Power Corporation (PCPC) applicants
Date Docketed:7/19/2018
Published: 7/19/2018


Order, ERC Case No. 2017-010 RM, In the Matter of the Petition for the Adoption of the Proposed Amendments to the 2006 Open Access Transmission Services Rules (OATS Rules), National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:7/16/2018
Published: 7/16/2018


Initial Order, ERC Case No. 2018-059 RC, In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and Therma Luzon, Inc., with Prayer for Issuance of Provisional Authority, National Grid Corporation of the Philippines (NGCP) and Therma Luzon, Inc. (TLI) applicants
Date Docketed:7/16/2018
Published: 7/16/2018



Initial Order, ERC Case No. 2018-010 MC, In the Matter of the Application for Approval of the Authority to Develop, Own and Operate Point - To - Point Limited Transmission Facilities, with Motions for Provisional Authority and Confidential Treatment of Information, GNPower Kauswagan Ltd. Co. (GNPK) applicant
Date Docketed:7/6/2018
Published: 7/6/2018

123456

PROMULGATED RULES

ERC APPROVED ASPA CONTRACTS BETWEEN AS PROVIDER AND NGCP

WORKS IN PROGRESS

CaseNoTitleApplicantDate PostedDate Docketed
2018-085-RCIn the Matter of the Application for Approval of the Feed - In Tariff Allowance for Calendar Year 2019 Pursuant to the Guidelines for the Collection of the Feed In Tariff Allowance and Disbursement of the Feed In Tariff Allowance Fund, with Prayer for Provisional Authority National Transmission Corporation (TRANSCO)7/27/20187/27/2018
2018-074-RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and Southwest Luzon Power Generation Corporation, with Prayer for the Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP) and Southwest Luzon Power Generation Corporation (SLPGC)7/12/20187/12/2018
2018-073 RCIn the Matter of the Application for the Approval for the Approval of Force Majeure Event Regulated FM Pass-Through for Earthquake in Leyte in the Visayas Region, In Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for Provisional AuthorityNational Grid of the Philippines (NGCP)7/5/20187/5/2018
2018-059 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and Therma Luzon, Inc., with Prayer for Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP) and Therma Luzon, Inc. (TLI) 6/21/20186/21/2018
2018-043 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and Palm Concepcion Power Corporation, with Prayer for the Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP) and Palm Concepcion Power Corporation (PCPC)5/15/20185/15/2018
2018-017 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation the Philippines and Phinma Power Generation Corporation (Bulacan Plant) with Prayer for the Issuance of Provisional Authority National Grid Corporation the Philippines (NGPC) and Phinma Energy Corporation (PHINMA Energy)3/23/20183/23/2018
2018-016 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation the Philippines and Phinma Energy Corporation (Subic Plant) with Prayer for the Issuance of Provisional Authority National Grid Corporation the Philippines (NGPC) and Phinma Energy Corporation (PHINMA Energy)3/23/20183/23/2018
2018-010 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines (NGCP) and Masinloc Power Partners Co. Ltd. (MPPCL), with Prayer for Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP) and Masinloc Power Partners Co. Ltd. (MPPCL)2/28/20182/28/2018
2018-005 RCIn the Matter of the Application for the Approval of the Sale of Various Sub-Transmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Isabela II Electric Cooperative, Inc. (ISELCO II), as Covered by an Amended Lease Purchase Agreement (LPA) dated 20 May 2015National Transmission Corporation (TRANSCO) and Isabela II Electric Cooperative, Inc. (ISELCO II)1/25/20181/25/2018

 TRANSMISSION SECTOR

Transmission Sector. The transmission of electric power shall be a regulated common electricity carrier business subject to the ratemaking powers of the ERC. (Sec. 7, RA 9136)

Creation of the National Transmission Company. The TRANSCO shall assume the authority of NPC for the planning, construction and centralized operation and maintenace of its high voltage transmission facilities, including grid interconnections and ancillary services. (Sec. 8, RA 9136)


© 2018 - Energy Regulatory Commission