Notice of continuation of public hearing for the approval of the PDM for WESM [Archive-1]

Notice is hereby given that the continuation of public hearing for the approval of the Price Determination Methodology (PDM) for the Philippine Wholesale Electricity Spot Market (WESM) is set on 20 April 2006, 9:00 a.m. at the ERC – Hearing Room, 15th Floor, Pacific Center Building, San Miguel Avenue, Pasig City.

The Philippine Electricity Market Corporation (PEMC) re-filed with the Commission its application on 22 February 2006.

The submission of the PEMC is posted on this website.

Date Published: 4/5/2006

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System