Draft Determination IEEC [Archive-77]

On June 22, 2009, Ibaan Electric and Engineering Corporation (IEEC) filed an application for approval of its Annual Revenue Requirement (ARR) and Performance Incentive Scheme (PIS) for the Second Regulatory Period commencing on July 1, 2010 and terminating on June 30, 2014 in accordance with the provisions of the Rules for Setting Distribution Wheeling Rates (RDWR).

Having found said application sufficient in form and substance, the Commission set the same for jurisdictional hearing, expository presentation and pre-trial conference on August 25, 2009 and evidentiary hearing on September 8, 2009.   Said public hearings were scheduled with the end view of reaching out to as many stakeholders as possible, including consumers, who would be affected by the resolution of the application.
During the public hearings, IEEC presented several witnesses, who testified in support of its application.

In accordance with the RDWR and the Regulatory Reset Position Paper, the Commission shall issue a Draft Determination not later than November 20, 2009.  Said Draft Determination embodies the Commission’s preliminary position on the price control arrangements that should apply to the Second Regulatory Period and describes its initial evaluation of IEEC’s proposals in the instant application, as well as the evidence presented in support thereof during the public hearings up to the date of this issuance.

It is important to note that the Draft Determination is not a final decision.  This will only provide an opportunity for interested parties to comment and discuss the Commission’s evaluation during the public consultations and/or hearings to be held for that purpose, prior to the final determination.  The final determination will be issued by the Commission after the termination of the presentation of evidence by all the parties (both documentary and testimonial) during the public consultations and/or hearings and only after it has conducted a complete evaluation thereof.

The Draft Determination may be downloaded from the Commission’s official website at www.erc.gov.ph  or may be photocopied at cost during the usual office hours from the ERC Docket Section at the 22nd Floor, Pacific Center Building, San Miguel Avenue, Pasig City.  Relative thereto, the Draft Determination is hereby set for public consultation onFebruary 2, 2010 (Tuesday) at nine o’clock in the morning (9:00 A.M.) at the Recto Gym, J. Pastor St., Poblacion, Ibaan, Batangas.

Interested parties are hereby given until January 8, 2010 (Friday) to submit their written comments on the Draft Determination (both hard and soft copies) to the aforementioned address (soft copies may be sent to info@erc.gov.ph). The Commission encourages submission of said comments in its preferred format hereto attached asAnnex “A”.  On the other hand, those who may wish to have a copy of the Draft Determination may request IEEC, prior to the date of the initial hearing, that they be furnished with a copy thereof.  IEEC is hereby directed to furnish all those making such requests with copies of the Draft Determination, subject to reimbursement of reasonable photocopying costs.  Any party may examine the Draft Determination and other pertinent records filed with the Commission during the usual office hours.

Finally, IEEC is hereby directed to:

  1. Post a copy of this Notice in: a) its Main Office; b) Branch Office/s; and c) at least three (3) conspicuous places within its franchise area;
  2. Publish this Notice in at least one (1) newspaper of general circulation, immediately upon receipt thereof; and
  3. Undertake other possible means of disseminating information to the public relative to the above Draft Determination.

 

Date Published: 11/25/2009

 

Today at ERC
Thursday, November 21, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-068 RC [JU] [EX] [PT] [EV]
Applicant:
IEC
Venue:
IEC’s Principal Office, Metro-Rei Business Park, Brgy. Palindan, Ibaan, Batangas
Title:
In the Matter of the Application for the Approval of the Capital Expenditure Projects of Ibaan Electric Corporation (IEC) for the Years 2013 to 2018
Time:
10:00
Case No.:
2019-072 RC [JU] [EX] [PT] [EV]
Applicant:
ANECO
Venue:
ANECO's Main Office, Km. 2, J. C. Aquino Avenue, Butuan City, Agusan del Norte
Title:
In the Matter of the Application for the Approval of the Generation Rate for the Use (Acquisition and Operation) of Five (5) Units of Two (2) MW Modular Generation Sets and the Corresponding Loan from the National Electrification Administration (NEA)
Time:
14:00
Case No.:
2018-014 MC [EV]
Applicant:
NGCP
Venue:
ERC Hearing Room (15th floor)
Title:
Petition for the Approval of the Extension of the Period for Listing of the Shares of Stock of the National Grid Corporation of the Philippines
Time:
14:00
Case No.:
2019-025 MC [JU] [EX] [PT] [EV]
Applicant:
ELPI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point-to- Point Limited Transmission Facilities to Connect the 100MW Pasuquin Solar Power Plant to the National Grid Corporation of the Philippines Laoag 115 KV Substation, with Prayer for Provisional Authority

© 2019 - Energy Regulatory Commission