Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


Public Consultations for the Proposed Feed-In Tariff Rules [Archive-92]

Notice is hereby given that on March 10, 2010 the proposed Feed-In Tariff (FIT) Rules, which is attached as Annex “A”, is posted on the ERC website at www.erc.gov.ph.
Relative thereto, a Public Consultation for said Rules is scheduled on April 14, 2010 (Wednesday) at nine o'clock in the morning (9:00 a.m.) at the ERC Hearing Room, 15th Floor, Pacific Center Building, San Miguel Avenue, Pasig City.

All interested parties may submit their comments (in both hard and soft copies) using the prescribed format (copy hereto attached) on or before March 31, 2010 (Wednesday).  Electronic copies may be sent to fscjuan@erc.gov.ph.  Parties who have filed their written comments on or before the prescribed period would be given priority during the above-scheduled public consultation.  The proposed Rules may also be photocopied at cost, during the regular office hours at the ERC Main Office located at Pacific Center Building, San Miguel Avenue, Ortigas Center, Pasig City.

Date Published: 3/10/2010

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System

© 2019 - Energy Regulatory Commission