Annual Revenue Requrement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR) (2) [Archive-138]

On November 3, 2010, Clark Electric Distribution Corporation (CEDC) filed an application for approval of its Annual Revenue Requirement (ARR) and Performance Incentive Scheme (PIS) for the Second Regulatory Period commencing on October 1, 2011 and terminating on September 30, 2015 in accordance with the provisions of the Rules for Setting Distribution Wheeling Rates (RDWR).

Having found said application sufficient in form and in substance, the Commission set the same for jurisdictional hearing, expository presentation, pre-trial conference and evidentiary hearing on December 2, 2010 and January 12, 2011.   Said public hearings were scheduled with the end view of reaching out to as many stakeholders as possible, including consumers, who would be affected by the resolution of the instant application.

In accordance with the RDWR and Regulatory Reset Position Paper, the Commission shall issue a Draft Determination that embodies its preliminary position on the price control arrangements that should apply to the Third Regulatory Period and describes its initial evaluation of CEDC’s proposals in the instant application, as well as the evidence presented in support thereof during the public hearings up to the date of this issuance.

It is important to note that the Draft Determination is not a final decision.  This will only provide an opportunity for interested parties to comment and discuss the Commission’s evaluation during the public consultations and/or hearings to be held for that purpose, prior to the final determination.  The final determination will be issued by the Commission after the termination of the presentation of evidence by all the parties (both documentary and testimonial) during the public consultation and/or hearings and only after it has conducted a complete evaluation thereof.

The Draft Determination may be downloaded from the Commission’s official website at www.erc.gov.ph or may be photocopied at cost during the usual office hours from the ERC Docket Section at the 22nd Floor, Pacific Center Building, San Miguel Avenue, Pasig City.  Relative thereto, the Draft Determination is hereby set for public consultation on June 9, 2011 (Thursday) at two o’clock in the afternoon (2:00 P.M.) at the ERC Hearing Room, 15th Floor, Pacific Center Building, San Miguel Avenue, Pasig City.

Interested parties are hereby given until May 31, 2011 (Tuesday) to submit their written comments on the Draft Determination (both hard and soft copies) to the aforementioned address (soft copies may be sent to tariffs@erc.gov.ph).  The Commission encourages submission of said comments in its preferred format hereto attached as Annex “A”.  On the other hand, those who may wish to have a copy of the Draft Determination may request CEDC, prior to the date of the initial hearing, that they be furnished with a copy thereof.  CEDC is hereby directed to furnish all those making such requests with copies of the Draft Determination, subject to reimbursement of reasonable photocopying costs.  Any party may examine the Draft Determination and other pertinent records filed with the Commission during the usual office hours.

Finally, CEDC is directed to:

  1. Post a copy of this Notice in:  a) its Main Office; b) Branch office/s; and c) at least three (3) conspicuous places within its franchise area;
  2. Publish this Notice in at least one (1) newspaper of general circulation, immediately upon receipt hereof; and
  3. Undertake other possible means of disseminating information to the public relative to the above Draft Determination.
SO ORDERED.

Date Published: 5/13/2011

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System