Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


Notice to all distribution Utilities (DUs) in Region 9 & 11 [Archive-153]

The Energy Regulatory Commission (ERC) will hold a Seminar/Workshop on the Revised Uniform Reportorial Requirements (URR) on November 9 - 10, 2011 at the Waterfront Insular Hotel, Lanang, Davao City
 
The training delegates must be the personnel responsible for the computation of all automatic cost adjustments.
 
The registration fee is Five Thousand Pesos (PhP5,OOO.OO) per participant which includes the seminar/workshop fee, materials and food for the entire workshop.
 
Please confirm your attendance on or before November 2, 2011. For more details, you may call Ms. Cherry Gonzales at her mobile number 0947-730-9640 or e-mail her atcherry_lynn_gonzales@yahoo.com or Roselle Guintu at her mobile number 0928-506-5940 or email her at roselleguinto@yahoo.com.ph or Ms. Joy Pante at joy sancha@yahoo.com.

Date Published: 10/19/2011

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System

© 2019 - Energy Regulatory Commission