Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


NOTICE FOR COMMENTS, ERC Case No. 2019 - 003 RM, In Re: Rules for Setting Distribution Wheeling Rates (RDWR)

Notice is hereby given that on 13 June 2019, the Commission has approved for posting on its official website www.erc.gov.ph working drafts of the “Rules for Setting Distribution Wheeling Rates (RDWR)”, hereto attached as Annex “A” and “Regulatory Reset for the Fourth and Fifth Regulatory Period for the First Entry Group of Privately Owned Distribution Utilities subject to Performance Based Regulations, Issues Paper”, hereto attached as Annex “B”.
This draft rules and issues paper is a work in progress that will be presented to the Commission together with consolidated stakeholders’ inputs.
All interested parties may submit their comments on or before 1 July 2019, in both and hard copies, using the prescribe format. Hard copies shall be forwarded to the Commission’s Docket Section. Electronic copies may be sent to tariffs@erc.gov.ph. The aforementioned documents, including the prescribed format for comments may be downloaded from the ERC website, or may be photocopied at cost, during the regular office hours at the 18th Floor of the ERC Main Office, Pacific Center Building, San Miguel Avenue, Pasig City,
Thereafter, the working draft rules and issues paper will be set for public consultation on 5 July 2019, 9:00 AM at the 8th Floor ERC Main Office, Pacific Center Building, San Miguel Avenue, Ortigas Center, Pasig City.
All Comments, written or oral received by the Commission shall be made part of the record of the rule making proceeding and shall be considered in the finalization of the amendments to the RDWR and issuance of the Position Paper.


Submitted comments from Stakeholders:

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System

© 2019 - Energy Regulatory Commission