Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


Notice for Public Consultation, ERC Case No. 2019-001 RM, In the Matter of the Petition for the Amendment of the Guidelines for the Financial Standards of Generation Companies, Philippine Independent Power Producers Association, Inc. (PIPPA) petitioner

On 08 July 2019, the Commission issued an Order setting the instant case for public consultation (PubCon) for Luzon Stakeholders on 22 July 2019 (Monday) at 2:00 PM, at the ERC Hearing Room, 15th Floor, Pacific Center Bldg., San Miguel Avenue, Pasig City.
Subsequently, on 17 July 2019, the petitioner, PIPPA filed a Motion to Reset dated 17 July 2019 praying that the PubCon scheduled on 22 July 2019 be postponed citing the unavailability of its witness on the said date.
In consideration of the foregoing, the PubCon for Luzon Stakeholders is hereby reset to 29 July 2019 (Monday) at 2:00 PM, at the ERC Hearing Room, ERC Hearing Room, 15th Floor, Pacific Center Bldg., San Miguel Avenue, Pasig City.
All interested parties may submit their comments (both in hard and soft copies) on the instant Petition on or before 24 July 2019.  Electronic copies may be sent to tariff@erc.gov.ph. Parties who have filed their written comments on or before the prescribed period would be given priority during the above-scheduled public consultation.

Order, 2019-001 RM

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System

© 2019 - Energy Regulatory Commission