Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.



 Decisions

Select Year:

Decision, ERC Case No. 2018-015 SC, In Re: Violation of Article V, Section 1 of ERC Resolution No. 21, Series of 2010 (Filing of Consolidated Applications), Eastern Samar Electric Cooperative, Inc. (ESAMELCO) respondent
Date Docketed:11/14/2019
Published: 11/14/2019


Decision, ERC Case No. 2014-102 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Re: Failure to Comply with ERC Resolution No. 16, Series of 2009, as Amended by ERC Resolution and No. 2010 and Resolution No. 23, Series of 2010), Kalinga Apayao Electric Cooperative, Inc. (KAELCO) respondent
Date Docketed:11/14/2019
Published: 11/14/2019


Decision, ERC Case No. 2018-011 MC, In the Matter of Application for Authority to Develop, Own and/or Operate Dedicated Point-to-Point Limited Transmission Facilities to Connect the 500MW (Gross) Coal-Fired Power Plant to the Tayabas Substation of the National Grid Corporation of the Philippines (NGCP) through the Mauban Substation, San Buenaventura Power Ltd. Co (SBPL) applicant
Date Docketed:11/12/2019
Published: 11/12/2019


Decision, ERC Case No. 2017-016 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point to Point Limited Transmission Facilities, to Connect the 100 MW Solar Philippines Concepcion Solar Farm to the Transmission System of the National Grid Corporation of the Philippines (NGCP), with Prayer for Confidential Treatment of Information, Solar Philippines Tarlac Corporation (SPTC) applicant
Date Docketed:11/12/2019
Published: 11/12/2019


Decision, ERC Case No. 2018-034 SC, In Re: Violation of Paragraph (H) Section 17 of Commonwealth Act No. 146, and ERC Resolution No. 50, Series of 2006 (Non/Late Submission of Annual Report), Pampanga II Electric Cooperative, Inc. (PELCO II) respondent
Date Docketed:11/12/2019
Published: 11/12/2019


Decision, ERC Case No. 2017-005 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point-to-Point Limited Transmission Facilities to Connect the 11.22 MW Diesel Power Plant to the Surigao del Norte Electric Cooperative, Inc.'s Looc Substation, with Prayer for Provisional Authority, Nickel Asia Corporation (NAC) applicant
Date Docketed:11/7/2019
Published: 11/7/2019


Decision, ERC Case No. 2016-073 SC, In the Matter of Violation of ERC Orders, Rules and Regulations (Re: Failure to Comply with ERC Case No.16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010), Cagayan de Sulu Electric Cooperative, Inc. (CASELCO) respondent
Date Docketed:10/31/2019
Published: 10/31/2019


Decision, ERC Case No. 2014-063 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Re: Violation of Article VI, Section 6.1 of the Rules and Procedure for the Test and Maintenance of Electric Meters of Distribution Utilities [sampling program]), Kalinga Apayao Electric Cooperative, Inc. (KAELCO) respondent
Date Docketed:10/31/2019
Published: 10/31/2019


Decision, ERC Case No. 2016-084 SC, In the Matter of Violation of ERC Orders, Rules and Regulations (Re: Failure to Comply with ERC Resolution No.16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010), Davao del Norte Electric Cooperative, Inc. (DANECO) respondent
Date Docketed:10/25/2019
Published: 10/25/2019


Decision, ERC Case No. 2015-116 RC, In the Matter of the Application for Approval of Capital Expenditure Program for the Years 2014 to 2016, with Motion for Provisional Authority, Ilocos Sur Electric Cooperative, Inc. (ISECO) applicant
Date Docketed:10/24/2019
Published: 10/24/2019

12345678910...>>

Issuances

A compilation of ERC guidelines, rules, regulations, procedures, decisions, orders and resolutions. For other issuances not included in this section, please contact the Office of General Counsel and Secretariat at tel. no. (02) 631-5806, E-mail: ogcs@erc.gov.ph

Today at ERC
Monday, November 18, 2019

Hearing Schedules
Time:
14:00
Case No.:
2017-100 RC [EV]
Applicant:
NGCP
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Application for the Approval of the Connection Charges and Residual Subtransmission Charges for Calendar Years 2014 and 2015 on Subtransmission Assets of the National Grid Corporation of the Philippines, with Prayer for Provisional Authority

© 2019 - Energy Regulatory Commission