Promulgated Rules, Decisions and Orders



Decision, ERC Case No. 2021-080 SC, In re: Violation of Article V of ERC Resolution No. 10, Series of 2020 (Violation: 95.99 days of unplanned outage of PDPP III Unit Foxtrot in excess of the maximum allowable unplanned outage of 14 days), SPC Island Power Corporation (SIPC) respondent
Date Docketed:10/19/2021
Published: 10/19/2021


Decision, ERC Case No. 2021-069 SC, In Re: Violation of Article V of ERC Resolution No. 10, Series of 2020 (Violation: 21.2 days of unplanned outage of Malaya Thermal Unit 2 in excess of the maximum allowable unplanned outage of 27.8 days), Power Sector Assets and Liabilities Management Corporation (PSALM) respondent
Date Docketed:10/19/2021
Published: 10/19/2021



Decision, ERC Case No. 2021-068 SC, In Re: Violation of Article V of ERC Resolution No. 10, Series of 2020 (Violation: 22.64 days of unplanned outage of Nasulo GPP Unit 1 in excess of the maximum allowable unplanned outage of 13.7 days) Energy Development Corporation (EDC) respondent
Date Docketed:10/18/2021
Published: 10/18/2021



Initial Order, ERC Case No. 2021-078 RC, In the Matter of the Application for Approval of the Contract for the Supply of Electric Energy (CSEE) in the Visayas Grid with Bohol Light Company, Inc., Iloilo II Electric Cooperative, Inc., and More Electric and Power Corporation, with Prayer for Issuances of Provisional Authority, Power Sector Assets and Liabilities Management Corporation (PSALM) applicant
Date Docketed:10/18/2021
Published: 10/18/2021



Order, ERC Case No. 2012-085 RC, In the Matter of the Petition for the Approval of the Following Pursuant to ERC Resolution No. 21, Series of 2011: (a) Availments from the Universal Charge of the Share for Missionary Electrification (UCME) Subsidy for the Years 2012 to 2016; and (b) Recovery from the Universal Charge of the Shortfall in Missionary Electrification Subsidy for CY2011 and the Corresponding Adjustment of the UCME, with Prayer for Provisional Authority, National Power Corporation (NPC) applicant
Date Docketed:10/13/2021
Published: 10/13/2021



Initial Order, ERC Case No. 2021-075 RC, In the Matter of the Application for Approval of the Contract for the Supply of Electric Energy (CSEE) in the Luzon Grid with Camarines Sur IV Electric Cooperative, Inc. (CASURECO IV) with Prayer for Issuances of Provisional Authority (PA), Power Sector Assets and Liabilities Management Corporation (PSALM) applicant
Date Docketed:10/12/2021
Published: 10/12/2021



Order, ERC Case No. 2016-167 RC, In the Matter of the Application for Approval of the Interim Power Supply Agreement (IPSA) Between Clark Electric Distribution Corporation (CEDC) and Strategic Power Devt., Corporation (SPDC), Clark Electric Distribution Corporation (CEDC) and Strategic Power Devt., Corporation (SPDC) applicants
Date Docketed:10/12/2021
Published: 10/12/2021



Initial Order, ERC Case No. 2021-004 DR, In the Matter of Petition for Dispute Resolution Arising from the One Bohol Power Distribution Utilities (“1BP DU”) Joint Competitive Selection Process (“JCSP”) Through an Open Bidding for the Long-Term (2024-2033) Supply of the Baseload Power Requirements of 1BP DU, with Prayer for Status Quo Ante Order, By Way of Interim Relief, SMC Global Power Holdings Corp. (SMCGPHC) petitioner, versus 1BP DU JCSP COMMITTEE, Respondent.
Date Docketed:10/1/2021
Published: 10/1/2021



Order, ERC Case No. 2012-097 RC, In the Matter of the Application for the Approval of the Level of Market Transaction Fees for the Repayment of the Market Management System (MMS) Loan for the Philippine Wholesale Electricity Spot Market (WESM), Philippine Electricity Market Corporation (PEMC) applicant
Date Docketed:9/17/2021
Published: 9/17/2021



Order, ERC Case No. 2021-018 RC, In the Matter of the Joint Application for Approval of the Power Supply Agreement Between Manila Electric Company (MERALCO) and Masinloc Power Partners, Co., Ltd. (MPPCL) with Motion for Confidential Treatment of Information, Manila Electric Company (MERALCO) and Masinloc Power Partners, Co., Ltd. (MPPCL) applicants
Date Docketed:9/13/2021
Published: 9/13/2021

12345678

CERTIFICATE OF COMPLIANCE

Checklist of Requirements for COC Application Self Generation (SGF) with aggregate installed capacity below 1MW

Checklist of Requirements for COC Application Self Generation (SGF) with total installed capacity 1MW & above

Checklist of Requirements for new COC Application Independent Power Producer (IPP) Interim Mindanao Electricity Market (IMEM)

Checklist of Requirements for new COC Application SGF conversion to IPP Interim Mindanao Electricity Market (IMEM)

Checklist of Requirements for Qualified End-User COC Application

Checklist of Requirements for Amendment of COC (Application For Amendment of COC, Form 1 - 1 of 2, 2 of 2)

REQUIREMENTS AND PROCEDURES


WHOLESALE ELECTRICITY SPOT MARKET

1. About WESM

2. Market Monitoring Reports

  • 2017
    • Weekly Market Update

3. Summary of Comments on the Proposed Amendments to the Secondary Cap Scheme in the WESM

4. Resolution No. 06, Series of 2009, A Resolution Adopting the Rules for the Distribution of Net Settlement Surplus (3/13/2009)

5. WESM Rules

6. Forms for Metering Service Providers

WORKS IN PROGRESS

CaseNoTitleApplicantDate PostedDate Docketed
2021-081 RCIn the Matter of the Application for Approval of the Contracts for the Supply of Electric Energy in the Visayas Grid with Don Orestes Romualdez Electric Cooperative. (DORELCO), Eastern Samar Electric Cooperative, Inc. (ESAMELCO), Northern Samar Electric Cooperative, Inc. (NORSAMELCO), Samar II Electric Cooperative, Inc. (SAMELCO II) with Prayer for Issuance of Provisional AuthorityPower Sector Assets and Liabilities Management Corporation (PSALM)9/30/20219/30/2021
2021-080 RCIn the Matter of the Application for Approval of the Contract for the Supply of Electric Energy (CSEE) and the Subsequest Execution of the Letter of Agreement with Pampanga II Electric Cooperative, Inc. (PELCO II), in the Luzon Grid with Prayer for Issuance of Provisional Authority (PA)Power Sector Assets and Liabilities Management Corporation (PSALM)9/30/20219/30/2021
2021-078 RCIn the Matter of the Application for Approval of the Contract for the Supply of Electric Energy (CSEE) in the Visayas Grid with Bohol Light Company, Inc., Iloilo II Electric Cooperative, Inc., and More Electric and Power Corporation, with Prayer for Issuances of Provisional AuthorityPower Sector Assets and Liabilities Management Corporation (PSALM)9/23/20219/23/2021
2021-076 RCIn the Matter of the Application for Approval of the Contract for the Supply of Electric Energy in the Visayas Grid with Capiz Electric Cooperative, Inc., Cebu I Electric Cooperative, Inc., Guimaras Electric Cooperative, Inc., and Iloilo II Electric Cooperative, Inc., with Prayer for Issuances of Provisional AuthorityPower Sector Assets and Liabilities Management Corporation (PSALM)9/23/20219/23/2021
2021-075 RCIn the Matter of the Application for Approval of the Contract for the Supply of Electric Energy (CSEE) in the Luzon Grid with Camarines Sur IV Electric Cooperative, Inc. (CASURECO IV) with Prayer for Issuances of Provisional Authority (PA)Power Sector Assets and Liabilities Management Corporation (PSALM)9/23/20219/23/2021
2021-074 RCIn the Matter of Application for Approval of the Letter of Agreement with Several Distribution Utilities in the Visayas Grid, with Prayer for Issuances of Provisional AuthorityPower Sector Assets and Liabilities Management Corporation (PSALM)9/20/20219/20/2021
2021-067 RCIn the Matter of the Application for the Approval of the 21st Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment, with Prayer for Provisional Authority (PA)National Power Corporation (NPC) 8/24/20218/24/2021
2021-059 RCIn the Matter of the 11th Application for the True-Ip Adjustments of Fuel and Purchased Power Costs (TAFPPC) and Foreign Exchange-Related Costs (TAFxA) Under the Rules for the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange - Related Costs by the National Power Corporation, As AmendedPower Sector Assets and Liabilities Management Corporation (PSALM)7/23/20217/23/2021
2021-053 RCIn the Matter of Application for the Approval of the 21st Generation Rate Adjustment Mechanism (21st GRAM), with Prayer for Provisional Authority (PA)National Power Corporation (NPC)7/19/20217/19/2021
2021-042 RCIn the Matter of the Application for the Approval of the 20th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment, with Prayer for Provisional Authority (PA)National Power Corporation (NPC) 6/3/20216/3/2021
12

 GENERATION SECTOR

Generation Sector. Generation of electric power, a business affected with public interest, shall be competitive and open. (Sec. 6, RA 9136)

Generation Company refers to any person or entity authorized by the ERC to operate facilities used in the generation of electricity. (Sec 4 x, RA 9136)

Generation of Electricity refers to the production of electricity by a generation company or a co-generation facility pursuant to the provisions of this Act. (Sec 4 y, RA 9136)