Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.



Promulgated Rules, Decisions and Orders




Resolution No. 07, Series of 2021, A Resolution Adopting Amendments to the Resolution No. 04, Series of 2017 Entitled "Amendments to the Pre-emptive Mitigating Measure in the Wholesale Electricity Spot Market (WESM)"
Date Docketed:7/28/2021
Published: 7/28/2021




Order, ERC Case No. 2021-042 RC, In the Matter of the Application for the Approval of the 20th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment, with Prayer for Provisional Authority (PA), National Power Corporation (NPC) applicant
Date Docketed:7/26/2021
Published: 7/26/2021




Order, ERC Case No. 2016-002 RM, In the Matter of Petition to Initial Rule-Making for the Amendment of ERC Resolution No. 14, Series of 2015, Entitled “Resolution Adopting the Wind Feed-In Tariff (Wind FIT2) Rate, with Motion for Confidential Treatment of Information, Alternergy Wind One Corporation (AWOC), Petrowind Energy, Inc. (PWEI) and Trans-Asia Renewable Energy Corporation (TAREC) petitioners
Date Docketed:7/26/2021
Published: 7/26/2021



Order, ERC Case No. 2019-012 MC, In the Matter of the Application for Authority to Develop, Own and/or Operate Dedicated Point to Point Limited Facilities to Connect the 25mw Biomass Power Plant to the Bacolod - San Enrique 69 KV Line Through the Islasol II 12 Kilometer 69 KV Line, with Prayer for Provisional Authority, South Negros Biopower Inc. (SNBP) applicant
Date Docketed:7/19/2021
Published: 7/19/2021



Decision, ERC Case No. 2014-162 RC, In the Matter of the Joint Application for the Approval of the Electric Power Purchase Agreement Entered into by and between Bukidnon Second Electric Cooperative Inc. and FDC Misamis Power Corporation, Bukidnon Second Electric Cooperative, Inc. (BUSECO) and FDC Misamis Power Corporation (FDC Misamis) applicants
Date Docketed:7/19/2021
Published: 7/19/2021



Initial Order, ERC Case No. 2021-022 MC, In the Matter of the Application for Approval of the Business Separation and Unbundling Plan (BSUP) and Accounting and Cost Allocation Manual (ACAM), Sn Aboitiz Power-Magat, Inc. (SNAP-MI) Applicant
Date Docketed:7/16/2021
Published: 7/16/2021




Order, ERC Case No. 2021-041 RC, In the Matter of the Application for the Approval of the 20th Generation Rate Adjustment Mechanism, with Prayer for Provisional Authority (PA), National Power Corporation (NPC) applicant
Date Docketed:7/16/2021
Published: 7/16/2021




Initial Order, ERC Case No. 2021-041 RC, In the Matter of the Application for the Approval of the 20th Generation Rate Adjustment Mechanism, with Prayer for Provisional Authority (PA), National Power Corporation (NPC) applicant
Date Docketed:7/5/2021
Published: 7/5/2021




Order, ERC Case No. 2019-069 RC, In the Matter of the Petition for the Approval of the Availment from the Universal Charge for Missionary Electrification (UCME) for CY 2020 with Prayer for the Issuance of Provisional Authority, National Power Corporation (NPC) applicant
Date Docketed:7/5/2021
Published: 7/5/2021




Order, ERC Case Nos. 2014-021 RC, 2015-050 RC, 2016-019 RC, 2017-021 RC, 2018-103 RC and 2019-021 RC, In the Matter of the Petition for Availment of the Environmental Charge/Share for the Rehabilitation and Management of Watershed Areas (Plan 11 to Plan 16, National Power Corporation (NPC), petitioner
Date Docketed:7/5/2021
Published: 7/5/2021

123456

CERTIFICATE OF COMPLIANCE

Checklist of Requirements for COC Application Self Generation (SGF) with aggregate installed capacity below 1MW

Checklist of Requirements for COC Application Self Generation (SGF) with total installed capacity 1MW & above

Checklist of Requirements for new COC Application Independent Power Producer (IPP) Interim Mindanao Electricity Market (IMEM)

Checklist of Requirements for new COC Application SGF conversion to IPP Interim Mindanao Electricity Market (IMEM)

Checklist of Requirements for Qualified End-User COC Application

Checklist of Requirements for Amendment of COC (Application For Amendment of COC, Form 1 - 1 of 2, 2 of 2)

REQUIREMENTS AND PROCEDURES


WHOLESALE ELECTRICITY SPOT MARKET

1. About WESM

2. Market Monitoring Reports

  • 2017
    • Weekly Market Update

3. Summary of Comments on the Proposed Amendments to the Secondary Cap Scheme in the WESM

4. Resolution No. 06, Series of 2009, A Resolution Adopting the Rules for the Distribution of Net Settlement Surplus (3/13/2009)

5. WESM Rules

6. Forms for Metering Service Providers

WORKS IN PROGRESS

CaseNoTitleApplicantDate PostedDate Docketed
2021-059 RCIn the Matter of the 11th Application for the True-Ip Adjustments of Fuel and Purchased Power Costs (TAFPPC) and Foreign Exchange-Related Costs (TAFxA) Under the Rules for the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange - Related Costs by the National Power Corporation, As AmendedPower Sector Assets and Liabilities Management Corporation (PSALM)7/23/20217/23/2021
2021-053 RCIn the Matter of Application for the Approval of the 21st Generation Rate Adjustment Mechanism (21st GRAM), with Prayer for Provisional Authority (PA)National Power Corporation (NPC)7/19/20217/19/2021
2021-042 RCIn the Matter of the Application for the Approval of the 20th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment, with Prayer for Provisional Authority (PA)National Power Corporation (NPC) 6/3/20216/3/2021
2021-041 RCIn the Matter of the Application for the Approval of the 20th Generation Rate Adjustment Mechanism, with Prayer for Provisional Authority (PA)National Power Corporation (NPC) 6/3/20216/3/2021
2021-023 RCIn the Matter of the Petition for the Availment of the Environmental Charge / Share from the Universal Charge for the Rehabilitation and Management of Watershed Areas (Plan 17) National Power Corporation (NPC)3/31/20213/31/2021
2021-022 RCIn the Matter of the Petition for the Availment from the Universal Charge for Missionary Electrification (UCME) for CY 2022 with Prayer for the Issuance of Provisional Authority National Power Corporation (NPC)3/31/20213/31/2021
2021-017 RCIn the Matter of the Petition for the Petition for the Recovery of CY 2019 Revenue Shortfall from the Universal Charge for Missionary Electrification (UC-ME) and the Corresponding Adjustment of the UC-ME with Prayer for the Issuance of Provisional Authority National Power Corporation (NPC)3/16/20213/16/2021
2021-014 RCIn the Matter of the Application for the Approval of the Structure and Level of Market Transaction Fees for the Renewable Energy Market with Prayer for Provisional Authority Philippine Electricity Market Corporation (PEMC) 3/2/20213/2/2021

 GENERATION SECTOR

Generation Sector. Generation of electric power, a business affected with public interest, shall be competitive and open. (Sec. 6, RA 9136)

Generation Company refers to any person or entity authorized by the ERC to operate facilities used in the generation of electricity. (Sec 4 x, RA 9136)

Generation of Electricity refers to the production of electricity by a generation company or a co-generation facility pursuant to the provisions of this Act. (Sec 4 y, RA 9136)

ANNOUNCEMENTS

Online Certificate Of Compliance (COC) Filing is now on Soft-Launch. please click here.


© 2021 - Energy Regulatory Commission