Promulgated Rules, Decisions and Orders


Initial Order, ERC Case No. 2020-010 MC, In the Matter of the Application for Authority to Develop, Own and/or Operate Dedicated Point-to-Point Limited Facilities to Connect the 160MW Balaoi and Caunayan Wind Project to the Laoag Substation of the National Grid Corporation of the Philippines (NGCP), with Prayer for Provisional Authority, Bayog Wind Power Corporation (BWPC) applicant
Date Docketed:9/23/2020
Published: 9/23/2020



Order, ERC Case No. 2019-095 RC, In the Matter of the Application for the Approval of the Sale of Various Sub-Transmission Lines / Assets of the National Transmission Corporation (TRANSCO) to Agusan Del Sur Electric Cooperative, Inc. (ASELCO), as Covered by a Lease Purchase Agreement (LPA) dated 15 October 2019, National Transmission Corporation (TRANSCO) and Agusan del Sur Electric Cooperative, Inc. (ASELCO) applicants
Date Docketed:9/23/2020
Published: 9/23/2020


Initial Order, ERC Case No. 2020-011 MC, In the Matter of the Application for Authority to Develop, Own and/or Operated Dedicated Point-to-Point Limited Facilities to Connect the 120MWp DC Alaminos Solar Power Plant Project to the Bay 69 KV Substation of the National Grid Corporation of the Philippines (NGCP), with Prayer for Provisional Authority or Interim Relief, Solarace1 Energy Corp. (SOLARACE1) applicant
Date Docketed:9/17/2020
Published: 9/17/2020






Resolution No. 08, Series of 2020, A Resolution Adopting the Guidelines Governing Electronic Applications, Filing and Virtual Hearings Before the Energy Regulatory Commission
Date Docketed:9/16/2020
Published: 9/16/2020






Resolution No. 08, Series of 2020, A Resolution Adopting the Guidelines Governing Electronic Applications, Filing and Virtual Hearings Before the Energy Regulatory Commission (Annex A)
Date Docketed:9/16/2020
Published: 9/16/2020


Order, ERC Case No. 2020-001 MC, In the Matter of the Application for Authority to Develop, Own, Operate and Maintain Dedicated Point - to - Point Limited Facilities to Connect to the Transmission System of National Grid Corporation of the Philippines (NGCP), with Prayer for Provisional Authority, Kiangan Mini Hydro Corporation (KMHC) applicant
Date Docketed:9/14/2020
Published: 9/14/2020


Order, ERC Case No. 2016-163 RC, In the Matter of the Application of the National Grid Corporation of the Philippines for the Approval of Force Majeure Event Regulated FM Pass Through for Typhoon Ineng in Luzon, in Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for Provisional Authority, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:9/14/2020
Published: 9/14/2020


Initial Order, ERC Case No. 2020-009 MC, In the Matter of the Applicationfor Authority to Develop, Own and/or Operate Dedicated Point-to-Point Limited Transmission Facilities to Connect the +20MW Malita Battery Energy Storage System to the Mindanao Grid Via the Culaman 69KV Substation of the National Grid Corporation of the Philippines, with Prayer for Provisional Authority and Confidential Treatment of Information, Universal Power Solutions, Inc. (UPSI), applicant
Date Docketed:9/14/2020
Published: 9/14/2020


Initial Order, ERC Case No. 2020-005 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point-to-Point Limited Transmission Facilities to Connect the 18 MW Hydro Power Plant of the Timbaban River to the 69kV Transmission Line of the Visayas Grid of the National Grid Corporation of the Philippines, Oriental Energy and Power Generation Corporation (Oriental Energy) applicant
Date Docketed:9/14/2020
Published: 9/14/2020


Order, ERC Case No. 2019-086 RC, In the Matter of the Application for the Approval of the Interim Maximum Annual Revenue for Calendar Year 2020, with Prayer for the Urgent Issuance of Provisional Authority, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:9/2/2020
Published: 9/2/2020

12345678

PROMULGATED RULES

ERC APPROVED ASPA CONTRACTS BETWEEN AS PROVIDER AND NGCP

WORKS IN PROGRESS

CaseNoTitleApplicantDate PostedDate Docketed
2019-101 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement between the National Grid Corporation of the Philippines and AP Renewables Inc. (For Makban B), with Prayer for the Issuance of Provisional Authority National Grid of the Philippines (NGCP) and AP Renewables Inc. (APRI) Makban B12/27/201912/27/2019
2019-100 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement between the National Grid Corporation of the Philippines and AP Renewables Inc. (For Makban A), with Prayer for the Issuance of Provisional AuthorityNational Grid of the Philippines (NGCP) and AP Renewables Inc. (APRI) Makban A12/27/201912/27/2019
2019-095 RCIn the Matter of the Application for the Approval of the Sale of Various Sub-Transmission Lines / Assets of the National Transmission Corporation (TRANSCO) to Agusan Del Sur Electric Cooperative, Inc. (ASELCO), as Covered by a Lease Purchase Agreement (LPA) dated 15 October 2019National Transmission Corporation (TRANSCO) and Agusan del Sur Electric Cooperative, Inc. (ASELCO)12/20/201912/20/2019
2019-094 RCIn the Matter of the Application for the Approval of the Sale of Various Sub-Transmission Lines / Assets of the National Transmission Corporation (TRANSCO) to Cebu I Electric Cooperative, Inc. (CEBECO I), as Covered by a Contract to Sell dated 25 September 2019National Transmission Corporation (TRANSCO) and Cebu I Electric Cooperative, Inc. (CEBECO I)12/20/201912/20/2019
2019-093 RCIn the Matter of the Application for the Approval of the Implementation of the Lapu-lapu 230 KV Substation Project, with Prayer for Provisional Authority National Grid Corporation of the Philippines (NGCP)12/17/201912/17/2019
2019-092 RCIn the Matter of the Application for the Approval of the Implementation of the Cebu - Bohol 230 kV Interconnection Project, with Prayer for Provisional Authority National Grid Corporation of the Philippines (NGCP)12/17/201912/17/2019
2019-086 RCIn the Matter of the Application for the Approval of the Interim Maximum Annual Revenue for Calendar Year 2020, with Prayer for the Urgent Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP)10/29/201910/29/2019
2019-085 RCIn the Matter of the Application for the Approval of Force Majeure Event Regulated FM Pass-Through For Typhoon "Rosita" in Luzon, in Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for Provisional Authority National Grid Corporation of the Philippines (NGCP)10/29/201910/29/2019
2019-077 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and King Energy Generation, Inc. (Misamis Occidental Power Plant 2 - Panaon), with Prayer for the Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP) and King Energy Generation, Inc. (KEGI) 10/15/201910/15/2019
2019-076 RCIn the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Grid Corporation of the Philippines and King Energy Generation, Inc. (Misamis Occidental Power Plant 3 - Jimenez), with Prayer for the Issuance of Provisional Authority National Grid Corporation of the Philippines (NGCP) and King Energy Generation, Inc. (KEGI) 10/15/201910/15/2019
123

 TRANSMISSION SECTOR

Transmission Sector. The transmission of electric power shall be a regulated common electricity carrier business subject to the ratemaking powers of the ERC. (Sec. 7, RA 9136)

Creation of the National Transmission Company. The TRANSCO shall assume the authority of NPC for the planning, construction and centralized operation and maintenace of its high voltage transmission facilities, including grid interconnections and ancillary services. (Sec. 8, RA 9136)